  • Pre-engineering study for Development of Compound Storage of Eesti Energia Kaevandused AS, 2011;
  • Eesti Energia Narva Oil Plant’s BOTM Project Expertise of Main Design, 2009;
  • Eesti Energia Narva Oil Plant Reserve Conveyor Project Expertise of Main and Construction Design, 2009;
  • Technical assistance for reconstruction of the boiler utiliser at Narva Oil Plant, 2007;
  • Technical assistance for construction of the new wastewater treatment plant at Narva Oil Plant: preparation of tender documents, 2007;
  • Technical assistance for construction of the reserve conveyor fuel storage at Balti Power Plant: preparation of tender documents, 2007;
  • Expert assessment of the cost of the Balti Power Plant ash-sluicing water treatment plant project, 2007;
  • Use of biofuel for the Balti Power Plant energy unit No. 11, 2006;
  • Second stage of renovation of Narva Power Plants, consulting services, 2006;
  • Development of modernisation concept for the Eesti Power Plant heat supply system, 2006;
  • Expert assessment of the compensators and support structures of the Narva city heat networks, 2005.