References

Feasibility and profitability studies

  • The vision of the future of energy production and distribution in Sillamäe SEJ AS, 2018;
  • Multicriteria analyses of oil shale ash removal project in Narva Powerplant, 2008;
  • Pre-feasibility study for construction of gas turbine power plant, 2008;
  • Feasibility study for erection of the Tartu waste-to-energy CHP plant, 2008;
  • Feasibility study on installation of waste incineration unit at Iru Power Plant, 2007;
  • Pre-feasibility study on the construction of CHP plants in different regions of Estonia, 2006;
  • Assessment of possibilities for connecting the VKG Energia OÜ and Jõhvi-Ahtme heat networks, 2007;
  • Feasibility study on the energy supply renovation of Tehnopol (Tallinn), 2006; Technology Park
  • Pre-feasibility study for the gas supply project of Jõgeva county, 2005,
  • Pre-feasibility study on the natural gas-based CHP in Pärnu city, 2004;

Külgpaneeli navigatsioon